Ipc Whma A 620 Pdf Download

None of the information on this page is a substitute for having a copy of the A-620 Rev B standard. This information is intended to help guide you in understanding why specific tests and their required parameters are needed.

A-620BWhat is IPC/WHMA A-620?

The IPC/WHMA-A-620, Requirements and Acceptance for Cable/Wire Harness Assemblies is a joint project of IPC (Institute of Printed Circuits) and WHMA (Wire Harness Manufacturers Association). Originally released in 2002, the IPC/WHMA-A-620 has become the industry standard against which to measure quality.

The A-620 describes requirements for assemblies based on visual criteria. Detailed pictures communicate acceptable and unacceptable features of an assembly. In this way it provides a way to train factory floor people. It also sets expectations between customers and suppliers for the level of quality expected. You can purchase the current version (A-620 Rev B) at whma.org or ipc.org

What Has Happened with Cable Testing in A-620?

The A-620 was released in 2002 without a "Test" section. Cirris worked with other WHMA and IPC members in creating the test section (section 19), which became the major change in the A-620 standard (Rev A released in July of 2006).

In 2011, Cirris helped propose changes to the test section for the next edition of the A-620  standard (Rev B released in October of 2012). Further details of these changes can be found at the bottom of this page.

Defining Cable Tests and Test Level requirements

The Test Section uses three product classes, as defined in section 1.8 of A-620, for assemblies based on their intended use:

Class 1 - General Electronic Products

Includes products suitable for applications where the major requirement is the function of the completed assembly.

Class 2 - Dedicated Service Electronic Products

Includes products where continued performance and extended life is required, and for which uninterrupted service is desired but not critical. Typically, the end-use environment would not cause failures.

Class 3 - High Performance Electronic Products

Includes products where continued performance or performance-on-demand is critical, equipment downtime cannot be tolerated, end-use environment may be uncommonly harsh, and the equipment must function when required, such as life support systems and other critical systems.

Use of this standard requires agreement on the classes to which the product belongs. If the User and Manufacturer do not establish and document the acceptance class, the Manufacturer may do so. Accept and/or reject decisions shall be based on applicable documentation such as contracts, drawings, specifications, standards and reference documents. (A-620, section 1.8)

Cirris understands these classes to be defined as follows:

  • Class 1 – Consumer Products
  • Class 2 – Communications Equipment
  • Class 3 – Military, Life Support

A-620 Rev B Guidelines Summary

The table below shows the necessary test for each category of products.

Test General Electronic Products
Class 1
Dedicated Service Electronic Products
Class 2
High Performance Electronic Products
Class 3
Continuity Required Required 2 ohms or 1 ohm plus the maximum specified resistance of wire whichever is greater>
Shorts Required Required Required
Dielectric Withstand Voltage (DWV) Not Required With clearance distances (air gaps or creepage) ≥2 mm [0.079 in] and not coaxial/biaxial/triaxial assemblies:
no test required

With clearance distance (air gaps or creepage) <2 mm [0.079 in] or coaxial/biaxial/triaxial assemblies:

Voltage Level: 1000 VDC or equivalent peak AC voltage, Max Leakage Current: 1 mA, Dwell time: 0.1 Seconds

Voltage Level: 1500 VDC or equivalent peak AC voltage, Max Leakage Current: 1 mA, Dwell time: 1 Second

Insulation Resistance (IR)

Not Required

With clearance distances (air gaps air creepage) ≥2 mm [0.079 in]: no test required

With clearance distance (air gaps or creepage) <2 mm [0.079 in]:

Voltage Level: DC DWV Voltage or tester default

Minimum Insulation Resistance:

≥100M ohms for assemblies ≤3 meters [118 in]

≥10M ohms for assemblies >3 meters [118 in]

 ≥500 Meg ohms for coaxial cable of any length

Max Dwell time: 10 Seconds

Some Questions You Might Have About The A-620 Test Requirements

The DWV test has a "minimum" time and IR has a "maximum" time. Shouldn't they both be minimum times?

The Dielectric Withstand Voltage test (DWV) identifies a sudden breakdown in the insulation between conductors. This test must continue for some minimum time. The same maximum-allowable current threshold is used throughout the test time. Longer times have better chances of detecting faults.

The Insulation Resistance test (IR) detects a more consistent current flow between insulated conductors, stated as a resistance, by factoring in the applied voltage. When the voltage is first applied, the current usually peaks and then, due to humidity that might be dried out by the energy of applied voltage and something called "dielectric absorption", it trends lower over time. This means that the measured resistance starts lower and trends higher over time. The longer you apply the voltage, the better the final measured insulation resistance, so longer times allow cables with worse IR performance to pass. To shorten production test time without degrading the test, the IR test time ends as soon as the minimum resistance value is reached.

In Class 2 cables, why are high voltage (HV) tests required for close spaced contacts (<2 mm [0.079 in])? This seems backwards since the closer the spacing, the lower the voltage a connector is likely to be able to withstand.

It is true that smaller gaps between isolated conductors result in lower breakdown voltages. They also increase the chance of an intermittent or latent defect in the form of a short. With creepage distance >2 mm the likelihood of finding near-shorts with high voltage tests was not thought to offset the cost of the more rigorous HV tests that would be required.

In Class 2, just as in Class 3, small creepage distances can justify a reduction in the voltage applied for the high voltage test. The A-620 requirements specify that electrical tests should operate at such levels as not to degrade the electrical properties. However, the need for a good HV test increases as the spacing gets smaller. The costs of the testing should not increase when the voltage needs to be reduced. As a guide, you can see what problems you might encounter with your particular creepage distance using the Arc Gap Calculator.

When testing at 1000 VDC the gap must be larger than .15mm, (.006"). At 1500 VDC the gap must be larger than .48mm (.019"). These are rather small creepage distances. The HV test voltage is most likely problematic for very small connectors in Class 3 applications.

I have insulated wires or connectors with a specified maximum working voltage that is lower than those required in the A-620 test specification. Will these test voltages damage them? Am I caught in a double bind where these required test voltages are considered destructive and render the assembly unusable for service?

This question most often arises from those doing work under military contracts where interpretations for different requirements may conflict. If you have a reason to believe that testing will degrade your assembly, then you may want to perform some confirming tests and make use of a provision of the test section that requires electrical tests on good assemblies to not degrade reliability.

We are not aware of any research or proof that the insulation used in good assemblies can be degraded by high voltage during brief applications in the IR and DWV tests. Here are some sound reasons why this is not considered a risk:

  • Test time is very short and does not relate to the "working voltage" specifications. In addition, the energy levels are very low (test current is measured in mA) and performed under room temperature conditions.
  • Tests performed at the default voltages in A-620 have become very popular. They are patterned after tests such as MIL-STD-201 and other requirements that have existed for over 50 years and used on assemblies with much lower working voltages.
  • UL regularly requires 100% production tests in the thousands of volts on components and products that are rated at a working voltage of 120VAC.
  • Wiring and connectors conforming to military requirements regularly require 100% testing by manufactures at the component level at thousands of volts, even when their working voltage is specified at less than 1000 volts. As an example MIL-W-16878E TYPE EE (TFE hookup wire) rated at 1000 volts must be 100% production tested with a ball chain spark gap of 5,000 volts as part of its manufacturing process. Even wire for industrial and commercial applications is usually tested in the manufacturing process. When tested, the voltage used is in the thousands of volts.
  • A research project at Sandia National Labs tested aircraft wiring for degradation at thousands of volts without degradation. http://www.sandia.gov/electromagnetics/New_Reports/reports/Glover2003.pdf

If you become aware of research that supports the fear of degrading insulation in wiring or connectors with the short-term application of high-voltage, we would deeply appreciate knowing of it.

What changes were made between A-620 Rev A and A-620 Rev B?

The following changes were implemented in A-620 Rev B:

Table 19-2, Continuity Test Minimum Requirements, Class 3 (Proposed by Cirris):

The following words were added,

Rev A: "2 ohms or 1 ohm plus the resistance of wire whichever is greater"
Rev B: "2 ohms or 1 ohm plus the maximum specified resistance of wire whichever is greater"

Section 19.5.3, Electrical Test Methods – Dielectric Withstanding Voltage (DWV):

The following paragraph was added,

"On points to be tested, harnesses shall […]be tested for DWV for all isolated continuity paths as defined in continuity tests. Conductive connector shells and unused contact positions shall [N1D2D3] be included where a risk of a short exists."

Table 19-4 Dielectric Withstanding Voltage Test (DWV) Minimum Requirements (Proposed by Cirris):

The following note was added,

Note 2: Voltage Level is applicable when clearance distance tested is ≥0.58 mm [0.019 in] an agreement between the User and Manufacturer to de-rate these test levels would be expected.

Section 19.5.4 Electrical Test Methods – Insulation Resistance (IR) (Proposed by Cirris):

The following paragraph was added.

"On points to be tested, harnesses shall be tested for DWV for all isolated continuity paths as defined in continuity tests. Conductive connector shells and unused contact positions shall be included where a risk of a short exists."